GPO 110/30 kV Germany 2
Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Primary, Secondary & Protection System Implementation ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility. The project included implementation

Large-Scale GIS Deployment & Control Systems ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection

GIS Installation & Protection Automation Systems ELTEC50Hz Gridworx delivered the installation of 12 GIS 110 kV modules (type 8DN8) manufactured by Siemens. The project included

Reconstruction & Infrastructure Upgrade ELTEC50Hz Gridworx provides comprehensive modernization and reconstruction of transformer stations, focusing on performance, safety, and regulatory compliance. Services include dismantling outdated

TPS Systems & Network Infrastructure ELTEC50Hz Gridworx implemented telecommunications and structured network systems across MV and HV facilities. The works included prefabrication of TPS and

GIS 400 kV Switchgear Installation & Commissioning ELTEC50Hz Gridworx delivered the transport, installation, and commissioning of a 400 kV GIS switchgear system manufactured by Siemens.

Protection Systems Configuration & Commissioning ELTEC50Hz Gridworx performed detailed post-installation validation and commissioning works across multiple voltage levels. The scope included checks on 220 kV

Telecommunication Systems & Power Infrastructure Integration ELTEC50Hz Gridworx carried out advanced telecommunications and auxiliary system integration within a 400/110 kV substation. The project included prefabrication

Transmission Line Construction & Substation Expansion ELTEC50Hz Gridworx executed key works on a major 400 kV transmission corridor, supporting both new line construction and substation

Control Systems & Secondary Circuit Installation ELTEC50Hz Gridworx delivered the installation and integration of control and auxiliary systems within a 400/110 kV substation environment. The