Modernisation of HV and MV transformer stations

Reconstruction & Infrastructure Upgrade

ELTEC50Hz Gridworx provides comprehensive modernization and reconstruction of transformer stations, focusing on performance, safety, and regulatory compliance.

Services include dismantling outdated oil sump systems, execution of full civil works (excavation, reinforcement, concreting), installation of new steel structures, and verification of system tightness in line with environmental and safety requirements.

These upgrades extend asset lifespan while aligning infrastructure with current technical standards.

Share:

More Posts

GPO 110/30 kV Germany 2

Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

GPO110/30 kV Germany 1

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Poland 1 MCP 110/30 kV

Primary, Secondary & Protection System Implementation ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility. The project included implementation

Poland 2 PS 110 kV/MV

Large-Scale GIS Deployment & Control Systems ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection