Poland 1 MCP 110/30 kV

Primary, Secondary & Protection System Implementation

ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility.

The project included implementation of HV and MV primary and secondary circuits, construction of MV cable bridges, and execution of control, measurement, and commissioning works related to protection automation.

This ensures stable operation, accurate system monitoring, and readiness for continuous grid performance.

Share:

More Posts

GPO 110/30 kV Germany 2

Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

GPO110/30 kV Germany 1

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Poland 2 PS 110 kV/MV

Large-Scale GIS Deployment & Control Systems ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection

Poland 3 PS 110 kv/MV

GIS Installation & Protection Automation Systems ELTEC50Hz Gridworx delivered the installation of 12 GIS 110 kV modules (type 8DN8) manufactured by Siemens. The project included

Send us a message