Poland 2 PS 110 kV/MV

Large-Scale GIS Deployment & Control Systems

ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection systems.

The scope covered MV rail bridge construction, comprehensive measurement and protection works, and deployment of a supervisory control system by Siemens.

The project strengthens operational reliability and enables precise system control.

Share:

More Posts

GPO 110/30 kV Germany 2

Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

GPO110/30 kV Germany 1

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Poland 1 MCP 110/30 kV

Primary, Secondary & Protection System Implementation ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility. The project included implementation

Poland 3 PS 110 kv/MV

GIS Installation & Protection Automation Systems ELTEC50Hz Gridworx delivered the installation of 12 GIS 110 kV modules (type 8DN8) manufactured by Siemens. The project included