GPO 110/30 kV Germany 2

Installation of 110 kV Overhead Line Connection & Civil Works

For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection to establish a reliable high-voltage supply interface.

The scope included construction works such as foundation preparation and structural support installation, followed by the assembly and connection of high-voltage conductors. Execution required precise alignment between civil and electrical engineering disciplines to meet strict grid and safety requirements.

The completed connection enables stable energy transmission and reinforces the robustness of the surrounding grid infrastructure.

Share:

More Posts

GPO110/30 kV Germany 1

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Poland 1 MCP 110/30 kV

Primary, Secondary & Protection System Implementation ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility. The project included implementation

Poland 2 PS 110 kV/MV

Large-Scale GIS Deployment & Control Systems ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection

Poland 3 PS 110 kv/MV

GIS Installation & Protection Automation Systems ELTEC50Hz Gridworx delivered the installation of 12 GIS 110 kV modules (type 8DN8) manufactured by Siemens. The project included