Poland 6 400/110 kV

Telecommunication Systems & Power Infrastructure Integration

ELTEC50Hz Gridworx carried out advanced telecommunications and auxiliary system integration within a 400/110 kV substation.

The project included prefabrication of telecom cabinets, installation of external cabling, and participation in LAN/WAN commissioning. It also involved the transfer and integration of SDH and teleprotection systems from Ołtarzew and Konin.

Additional works covered auxiliary power supply integration and installation of 15 kV transformers with full equipment, ensuring reliable communication and protection across the station.

Share:

More Posts

GPO 110/30 kV Germany 2

Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

GPO110/30 kV Germany 1

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Poland 1 MCP 110/30 kV

Primary, Secondary & Protection System Implementation ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility. The project included implementation

Poland 2 PS 110 kV/MV

Large-Scale GIS Deployment & Control Systems ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection