Poland 6 PS 400/110 kV

Control Systems & Secondary Circuit Installation

ELTEC50Hz Gridworx delivered the installation and integration of control and auxiliary systems within a 400/110 kV substation environment.

The scope included installation of eight 110 kV control cabinets, as well as dedicated cabinets for the 400/110/15 kV transformer field. Works also covered full implementation of secondary circuits across high-voltage (HV) and medium-voltage (MV) systems, alongside auxiliary power infrastructure, including 220V AC/DC and 48V DC cabinets.

The project ensures stable system control, reliable auxiliary supply, and a structured foundation for protection and automation systems.

Share:

More Posts

GPO 110/30 kV Germany 2

Installation of 110 kV Overhead Line Connection & Civil Works For this project, ELTEC50Hz Gridworx delivered the installation of a 110 kV overhead line connection

GPO110/30 kV Germany 1

Replacement and Reassembly of Control and Measurement Circuitsalong with cable labeling ELTEC50Hz Gridworx executed the modernization of control and measurement systems within a 110/30 kV

Poland 1 MCP 110/30 kV

Primary, Secondary & Protection System Implementation ELTEC50Hz Gridworx delivered a full scope of electrical infrastructure works within a 110/30 kV facility. The project included implementation

Poland 2 PS 110 kV/MV

Large-Scale GIS Deployment & Control Systems ELTEC50Hz Gridworx executed the installation of 17 GIS 110 kV modules (type 8DN8), along with associated control and protection